Nn part 2b

From Wiki at Neela Nurseries
Jump to: navigation, search


^ Plant starts to pot

Plant starts to pot:

    • [✔] Concord and Niagra seedless grape stems - 2019-04-07 SUN ✔
    • [ ] "Piggy back" plant from Silver Creek Falls, ~August 2017
    • [ ] spireas douglasii
    • [✔] strawberry plants in water
    • [ ] species day lilies from cerca October 2017 soccer game
    • [ ] African daisies 4 / 4



^ 2018 Autumn Tasks

South side low:

  • [p] south walking ramp project steps (1):
    • [✔] continue retainer blocks along lowest topology line to ramp base
    • [✔] mulch lower part of ramp with wood chips
    • [✔] set next two retaining block rows and determine row count at garage corner
    • [ ] determine and mark safe slope along south side of south walking ramp, slope pending full soil leveling
  • [✔] remove tarped camelia clippings at first cherry tree and south fence


Front yard:

  • [✔] trim up and mulch scarlet runner beans at foot of chimney
  • [✔] trim yellow and white oriental lily stalks, weed and clean up there
  • [✔] trim over-weighted branches of piernis shrub next to deck
  • [✔] construct 6x6 foot rain cover

Grey water feature:

  • [✔] dig and bundle raspberries next to split rail fence
  • [✔] weed and level soil in this bed
  • [✔] lay gravel to make waste water basin


Notes:
(1) carry over project from 2018 spring.


^ 2019 winter tasks

This article section lists tasks not complete during autumn season. Working to move everything from [ ] to [½] to [✔] . . .

North side:

    • [ ] group together frost tender plants in 18 by 30 inch bins
    • [ ] group together hardy succulents to be wintered outside under rain covers
    • [ ] move potted perennials able to stay outdoors to middle terrace
      • [ ] complete small back-filling task at north end of middle terrace
    • [ ] complete weeding, venca and debris removal from north slope - BIG


South side low:

    • [ ] move firepit blocks to north slope
    • [ ] clear and mulch fire pit area with wood chips
    2019-02-05 noting walkability around firepit area:
    • [ ] level and mulch area between south arborvitae and graveled spot behind garage - BIG
    • [ ] level and mulch area at foot of hill where Tony and Sophia's potted apple tree rests
    • [ ] complete small two- to three-row retaining wall about south arbor vitae
    • [ ] plant lavendula stoechas at foot of arbor vitae, sunny side
    • [ ] plant hardy cyclamen seedlings beneath arbor vitae, shadier side
    Larger south side task:
    • [ ] disposition all potted plants in and between firepit and lower hill side cherry trees (3)
    South walking ramp project steps [p] . . .
      • [✔] locate and clear concrete and other debris from garage foundation corner
      • [✔] lay gravel and set first retainer blocks at garage foundation corner
      • [✔] second pass corrective leveling of garage side retaining blocks
      • [✔] place successive retainer block rows to 46 cm below siding
      • [ ] backfill house side retainer block wall with soil
      • [ ] allow soil to settle about one month
      • [ ] plant carex obnupta or sword fern
      • [ ] mulch top of house side retained soil with wood chips

    Slope among cherry trees . . .

    • [ ] mulch with wood chips between lowest elevation cherry trees
    • [ ] mark locations for first five walking steps at second cherry tree from garage along south fence
    • [½] trim largest cherry tree near garage
    • [✔] remove smaller cherry tree leaning on fence half way up hill
    • [✔] remove large cherry tree closest to fence
    • [ ] locate a planting spot for dawn redwood tree near largest cherry tree


South side high:

    • [ ] lay retainer blocks at top corner iris leaf composting spot
    • [ ] mark trench line for water run-off from higher property east of backyard hillside
    • [ ] set two- to three-block high temporary wall just below unwashed pots
      • [ ] level below wall and plant sword ferns
      • [ ] level above wall and lay fine gravel


Front yard:

    Lawn repair at northwest downspout . . .
    • [ ] remove last bit old sod and level and replant grass seed at southeast downspout French drain
    Grey water feature . . .
    • [ ] lay larger stones about basin gravel
    • [ ] mulch with wood chips around gravel basin
    • [ ] lay larger square walking stones two or three for access to slope along rail fence
    • [ ] consider space for day lilies or agapanthus between gravel basin and strawberries in row
    Lawn repair at removed sorrel patch . . .
    • [ ] clear all forbs and weeds from the area of 2018 removed sod and sheep sorrel
    • [ ] bring better soil to level and smooth this area near lilac
    • [ ] tamp over two dry days and allow to settle for one to two weeks
    • [ ] seed with fescue and cover with caging wire to protect until grass mostly filled in
      • [ ] Lawn repairs where red thread fungus Laetisaria fuciformis removed

      https://www.rhs.org.uk/advice/profile?pid=268