Difference between revisions of "Nn-2023"

From Wiki at Neela Nurseries
Jump to: navigation, search
m
m
Line 7: Line 7:
 
(2) cherry tree pruning<br />
 
(2) cherry tree pruning<br />
 
(3) apple tree seedling planting, tree from 57th driveway<br />
 
(3) apple tree seedling planting, tree from 57th driveway<br />
 +
(4) plant aloe at present site of creme rhododendron<br />
 
</ul>
 
</ul>
  
Line 13: Line 14:
 
== [[#top|^]] Details ==
 
== [[#top|^]] Details ==
  
(1)
+
(1) Retaining wall cut out
 +
<ul>
 +
[ ] Mark and measure desired cut out<br />
 +
[ ] Call and compare concrete cutting services<br />
 +
[ ] clear any additional space needed for cutting service providers<br />
 +
</ul>
  
(2)
+
(2) cherry tree pruning
 +
<ul>
 +
[ ] <br />
 +
[ ] <br />
 +
</ul>
  
 
(3) Apple tree planting:
 
(3) Apple tree planting:
Line 30: Line 40:
 
[ ] retaining wall construction at third stage tier<br />
 
[ ] retaining wall construction at third stage tier<br />
 
</ul>
 
</ul>
 +
 +
(4) prepare in ground aloe site for planting
 +
<ul>
 +
. . .
 +
</ul>
 +
  
 
<!-- c -->
 
<!-- c -->

Revision as of 05:57, 13 March 2023

Projectos de 2023

^ Projects

    (1) retaining wall cut out and walking ramp
    (2) cherry tree pruning
    (3) apple tree seedling planting, tree from 57th driveway
    (4) plant aloe at present site of creme rhododendron


^ Details

(1) Retaining wall cut out

    [ ] Mark and measure desired cut out
    [ ] Call and compare concrete cutting services
    [ ] clear any additional space needed for cutting service providers

(2) cherry tree pruning

    [ ]
    [ ]

(3) Apple tree planting:

    [ ] yellow tall bearded iris seedling move to center terrace
    [ ] site / locate in ground place for apple tree
    [ ] new terrace marking and measurement about apple tree site
    [ ] first stage soil removal including hole for tree planting
    [ ] retaining wall about area of first stage soil removal
    [ ] tree planting
    [ ] second stage / tier soil removal
    [ ] retaining wall construction at second stage tier
    [ ] third stage / tier soil remove
    [ ] retaining wall construction at third stage tier

(4) prepare in ground aloe site for planting

    . . .


^ New plantings tasks

[ ] locate site or sites for sunflowers
[ ] locate site for green gladiolas of march 12
[ ] locate site for yellow squash
[ ] locate site for pumpkins
[ ] locate site for lettuce


^ Smaller tasks

[ ] purple aster dividing

[ ] move white shale stones to top middle terrace [ ] create top middle terrace with shale pieces, flatten top at level of red fence

[ ] strawberry flats preparation

[ ] gleditsia tree lift and pot from strawberry row

[ ] Saint John's wort removal from strawberry row

[ ] Saint John's wort removal from backyard slope