Difference between revisions of "Nn-2023"
From Wiki at Neela Nurseries
m |
m |
||
Line 7: | Line 7: | ||
(2) cherry tree pruning<br /> | (2) cherry tree pruning<br /> | ||
(3) apple tree seedling planting, tree from 57th driveway<br /> | (3) apple tree seedling planting, tree from 57th driveway<br /> | ||
+ | (4) plant aloe at present site of creme rhododendron<br /> | ||
</ul> | </ul> | ||
Line 13: | Line 14: | ||
== [[#top|^]] Details == | == [[#top|^]] Details == | ||
− | (1) | + | (1) Retaining wall cut out |
+ | <ul> | ||
+ | [ ] Mark and measure desired cut out<br /> | ||
+ | [ ] Call and compare concrete cutting services<br /> | ||
+ | [ ] clear any additional space needed for cutting service providers<br /> | ||
+ | </ul> | ||
− | (2) | + | (2) cherry tree pruning |
+ | <ul> | ||
+ | [ ] <br /> | ||
+ | [ ] <br /> | ||
+ | </ul> | ||
(3) Apple tree planting: | (3) Apple tree planting: | ||
Line 30: | Line 40: | ||
[ ] retaining wall construction at third stage tier<br /> | [ ] retaining wall construction at third stage tier<br /> | ||
</ul> | </ul> | ||
+ | |||
+ | (4) prepare in ground aloe site for planting | ||
+ | <ul> | ||
+ | . . . | ||
+ | </ul> | ||
+ | |||
<!-- c --> | <!-- c --> |
Revision as of 05:57, 13 March 2023
Projectos de 2023
^ Projects
-
(1) retaining wall cut out and walking ramp
(2) cherry tree pruning
(3) apple tree seedling planting, tree from 57th driveway
(4) plant aloe at present site of creme rhododendron
^ Details
(1) Retaining wall cut out
-
[ ] Mark and measure desired cut out
[ ] Call and compare concrete cutting services
[ ] clear any additional space needed for cutting service providers
(2) cherry tree pruning
-
[ ]
[ ]
(3) Apple tree planting:
-
[ ] yellow tall bearded iris seedling move to center terrace
[ ] site / locate in ground place for apple tree
[ ] new terrace marking and measurement about apple tree site
[ ] first stage soil removal including hole for tree planting
[ ] retaining wall about area of first stage soil removal
[ ] tree planting
[ ] second stage / tier soil removal
[ ] retaining wall construction at second stage tier
[ ] third stage / tier soil remove
[ ] retaining wall construction at third stage tier
(4) prepare in ground aloe site for planting
-
. . .
^ New plantings tasks
[ ] locate site or sites for sunflowers
[ ] locate site for green gladiolas of march 12
[ ] locate site for yellow squash
[ ] locate site for pumpkins
[ ] locate site for lettuce
^ Smaller tasks
[ ] purple aster dividing
[ ] move white shale stones to top middle terrace [ ] create top middle terrace with shale pieces, flatten top at level of red fence
[ ] strawberry flats preparation
[ ] gleditsia tree lift and pot from strawberry row
[ ] Saint John's wort removal from strawberry row
[ ] Saint John's wort removal from backyard slope