Difference between revisions of "Nn-2023"
From Wiki at Neela Nurseries
m (Give big projects numbers, start details section for large projects.) |
m |
||
Line 4: | Line 4: | ||
<ul> | <ul> | ||
− | (1) retaining wall cut out and walking ramp | + | (1) retaining wall cut out and walking ramp<br /> |
− | (2) cherry tree pruning | + | (2) cherry tree pruning<br /> |
− | (3) apple tree seedling planting, tree from 57th driveway | + | (3) apple tree seedling planting, tree from 57th driveway<br /> |
</ul> | </ul> | ||
<!-- c --> | <!-- c --> | ||
− | == Details == | + | == [[#top|^]] Details == |
(1) | (1) | ||
Line 17: | Line 17: | ||
(2) | (2) | ||
− | (3) | + | (3) Apple tree planting: |
<ul> | <ul> | ||
[ ] yellow tall bearded iris seedling move to center terrace<br /> | [ ] yellow tall bearded iris seedling move to center terrace<br /> | ||
Line 28: | Line 28: | ||
[ ] retaining wall construction at second stage tier<br /> | [ ] retaining wall construction at second stage tier<br /> | ||
[ ] third stage / tier soil remove<br /> | [ ] third stage / tier soil remove<br /> | ||
− | [ ] retaining wall construction at third stage tier | + | [ ] retaining wall construction at third stage tier<br /> |
</ul> | </ul> | ||
<!-- c --> | <!-- c --> | ||
+ | |||
+ | == [[#top|^]] New plantings tasks == | ||
+ | |||
+ | [ ] locate site or sites for sunflowers <br /> | ||
+ | [ ] locate site for green gladiolas of march 12<br /> | ||
+ | [ ] locate site for yellow squash<br /> | ||
+ | [ ] locate site for pumpkins<br /> | ||
+ | [ ] locate site for lettuce<br /> | ||
+ | |||
+ | <!-- c --> | ||
+ | |||
+ | == [[#top|^]] Smaller tasks == | ||
+ | |||
+ | [ ] purple aster dividing<br /> | ||
+ | |||
+ | [ ] move white shale stones to top middle terrace | ||
+ | [ ] create top middle terrace with shale pieces, flatten top at level of red fence | ||
+ | |||
+ | [ ] strawberry flats preparation<br /> | ||
+ | |||
+ | [ ] gleditsia tree lift and pot from strawberry row<br /> | ||
+ | |||
+ | [ ] Saint John's wort removal from strawberry row<br /> | ||
+ | |||
+ | [ ] Saint John's wort removal from backyard slope<br /> | ||
+ | |||
+ | |||
<!-- comentario --> | <!-- comentario --> |
Revision as of 05:44, 13 March 2023
Projectos de 2023
^ Projects
-
(1) retaining wall cut out and walking ramp
(2) cherry tree pruning
(3) apple tree seedling planting, tree from 57th driveway
^ Details
(1)
(2)
(3) Apple tree planting:
-
[ ] yellow tall bearded iris seedling move to center terrace
[ ] site / locate in ground place for apple tree
[ ] new terrace marking and measurement about apple tree site
[ ] first stage soil removal including hole for tree planting
[ ] retaining wall about area of first stage soil removal
[ ] tree planting
[ ] second stage / tier soil removal
[ ] retaining wall construction at second stage tier
[ ] third stage / tier soil remove
[ ] retaining wall construction at third stage tier
^ New plantings tasks
[ ] locate site or sites for sunflowers
[ ] locate site for green gladiolas of march 12
[ ] locate site for yellow squash
[ ] locate site for pumpkins
[ ] locate site for lettuce
^ Smaller tasks
[ ] purple aster dividing
[ ] move white shale stones to top middle terrace [ ] create top middle terrace with shale pieces, flatten top at level of red fence
[ ] strawberry flats preparation
[ ] gleditsia tree lift and pot from strawberry row
[ ] Saint John's wort removal from strawberry row
[ ] Saint John's wort removal from backyard slope