Difference between revisions of "Nn-2023"

From Wiki at Neela Nurseries
Jump to: navigation, search
(Starting local notes for 2023 projects, prior change actually a page to link to various years' projects)
 
m (Give big projects numbers, start details section for large projects.)
Line 1: Line 1:
 
Projectos de 2023
 
Projectos de 2023
  
 +
== [[#top|^]] Projects ==
  
 
<ul>
 
<ul>
* [ ] retaining wall cut out and walking ramp
+
(1) retaining wall cut out and walking ramp
* [ ] cherry tree pruning
+
(2) cherry tree pruning
* [ ] apple tree seedling planting
+
(3) apple tree seedling planting, tree from 57th driveway
 
</ul>
 
</ul>
  
 +
<!-- c -->
 +
 +
== Details ==
 +
 +
(1)
 +
 +
(2)
 +
 +
(3) [[#top|^]] Apple tree planting:
 +
<ul>
 +
[ ] yellow tall bearded iris seedling move to center terrace<br />
 +
[ ] site / locate in ground place for apple tree<br />
 +
[ ] new terrace marking and measurement about apple tree site<br />
 +
[ ] first stage soil removal including hole for tree planting<br />
 +
[ ] retaining wall about area of first stage soil removal<br />
 +
[ ] tree planting<br />
 +
[ ] second stage / tier soil removal<br />
 +
[ ] retaining wall construction at second stage tier<br />
 +
[ ] third stage / tier soil remove<br />
 +
[ ] retaining wall construction at third stage tier
 +
</ul>
 +
 +
<!-- c -->
  
 
<!-- comentario -->
 
<!-- comentario -->

Revision as of 05:33, 13 March 2023

Projectos de 2023

^ Projects

    (1) retaining wall cut out and walking ramp (2) cherry tree pruning (3) apple tree seedling planting, tree from 57th driveway


Details

(1)

(2)

(3) ^ Apple tree planting:

    [ ] yellow tall bearded iris seedling move to center terrace
    [ ] site / locate in ground place for apple tree
    [ ] new terrace marking and measurement about apple tree site
    [ ] first stage soil removal including hole for tree planting
    [ ] retaining wall about area of first stage soil removal
    [ ] tree planting
    [ ] second stage / tier soil removal
    [ ] retaining wall construction at second stage tier
    [ ] third stage / tier soil remove
    [ ] retaining wall construction at third stage tier