Difference between revisions of "Nn-2023"
From Wiki at Neela Nurseries
(Starting local notes for 2023 projects, prior change actually a page to link to various years' projects) |
m (Give big projects numbers, start details section for large projects.) |
||
Line 1: | Line 1: | ||
Projectos de 2023 | Projectos de 2023 | ||
+ | == [[#top|^]] Projects == | ||
<ul> | <ul> | ||
− | + | (1) retaining wall cut out and walking ramp | |
− | + | (2) cherry tree pruning | |
− | + | (3) apple tree seedling planting, tree from 57th driveway | |
</ul> | </ul> | ||
+ | <!-- c --> | ||
+ | |||
+ | == Details == | ||
+ | |||
+ | (1) | ||
+ | |||
+ | (2) | ||
+ | |||
+ | (3) [[#top|^]] Apple tree planting: | ||
+ | <ul> | ||
+ | [ ] yellow tall bearded iris seedling move to center terrace<br /> | ||
+ | [ ] site / locate in ground place for apple tree<br /> | ||
+ | [ ] new terrace marking and measurement about apple tree site<br /> | ||
+ | [ ] first stage soil removal including hole for tree planting<br /> | ||
+ | [ ] retaining wall about area of first stage soil removal<br /> | ||
+ | [ ] tree planting<br /> | ||
+ | [ ] second stage / tier soil removal<br /> | ||
+ | [ ] retaining wall construction at second stage tier<br /> | ||
+ | [ ] third stage / tier soil remove<br /> | ||
+ | [ ] retaining wall construction at third stage tier | ||
+ | </ul> | ||
+ | |||
+ | <!-- c --> | ||
<!-- comentario --> | <!-- comentario --> |
Revision as of 05:33, 13 March 2023
Projectos de 2023
^ Projects
-
(1) retaining wall cut out and walking ramp
(2) cherry tree pruning
(3) apple tree seedling planting, tree from 57th driveway
Details
(1)
(2)
(3) ^ Apple tree planting:
-
[ ] yellow tall bearded iris seedling move to center terrace
[ ] site / locate in ground place for apple tree
[ ] new terrace marking and measurement about apple tree site
[ ] first stage soil removal including hole for tree planting
[ ] retaining wall about area of first stage soil removal
[ ] tree planting
[ ] second stage / tier soil removal
[ ] retaining wall construction at second stage tier
[ ] third stage / tier soil remove
[ ] retaining wall construction at third stage tier